AEA Prefabrik AEA PREFABRİK Strength in Professionalism

Construction Site Camps and Large-Scale Building Mobilization

In large infrastructure and energy projects, the accommodation, catering and working needs of hundreds of people must be met in a short time. A construction site camp is a mobilization solution that gathers dormitories, canteens, offices, an infirmary and social areas into a single settlement plan.

Large-scale construction site camp settlement made up of prefabricated structures

AEA Prefabrik plans the camp settlement based on capacity calculations and a modular design. By using prefabricated and container systems together, we create a site-specific, scalable living arrangement.

Who is it for?

Who this solution suits

Main contractors of infrastructure, energy and mining projects
Large construction operations at home and abroad
Public projects planning mass accommodation and mobilization
Institutions setting up rapid post-disaster settlements
How the system works

Operating principle

  1. 1 The staff capacity and function list are drawn up.
  2. 2 The settlement plan is designed with dormitories, canteens, offices and social areas.
  3. 3 The modules are produced, shipped to the site and connected to the infrastructure.
  4. 4 Electricity, water, waste and security systems are commissioned.
Advantages

Key advantages

Capacity plan

The settlement is scaled according to the number of staff.

Fast mobilization

The modular design allows installation to be carried out in parallel.

Full function

Accommodation, catering, office and social areas are gathered in a single settlement.

Reuse

At the end of the project, the modules are dismantled and reused on another site.

Technical scope

Scope content

  • Dormitory and staff accommodation modules
  • Canteen, kitchen and storage units
  • Office, meeting and administrative units
  • WC, laundry and infirmary modules
  • Infrastructure, lighting and security integration
Process

From planning to delivery

1

Assessment

Capacity and site analysis.

2

Planning

Settlement and function design.

3

Production

Module manufacture.

4

Mobilization

Shipment and site installation.

5

Commissioning

Infrastructure connections and handover.

Frequently asked questions

Common questions

For how many staff can a camp be set up?
Thanks to the modular design, it can be scaled from small teams to settlements for hundreds of people. Capacity is planned according to the site and the project duration.
What happens to the camp at the end of the project?
The modules can be dismantled and moved to another site or reused.
Do you carry out installation on overseas projects?
The logistics and assembly scope is planned on a project basis. You can contact our export team for details.